November 3, 1997
- Test on the orbit feedback system was carried out (9:00
AM - 9:32 PM).
- Test on a new man-machine interface (MMI) for the MPW#13
was also carried out.
- Vacuum conditioning was carried out in the midnight.
- Operational data in this morning:
| Time |
Beam current |
Beam lifetime |
I*tau |
Average pressure |
Integrated current |
| 9:00 AM |
320.7 mA |
520 minutes |
167 A*minutes |
0.60 nTorr |
201.6 A*hours |

Beam current (blue line) and beam lifetime
(red line) around the clock.