November 3, 1997
Test on the orbit feedback system was carried out (9:00 AM - 9:32 PM).
Test on a new man-machine interface (MMI) for the MPW#13 was also carried out.
Vacuum conditioning was carried out in the midnight.
Operational data in this morning:
Time
Beam current
Beam lifetime
I*tau
Average pressure
Integrated current
9:00 AM
320.7 mA
520 minutes
167 A*minutes
0.60 nTorr
201.6 A*hours
Beam current (blue line) and beam lifetime (red line) around the clock.