November 15-21, 1997

November 15 , 16 , 17 , 18 , 19 , 20 , 21


November 15

Beam current (blue trace) and lifetime (red one) around the clock.


November 16

Beam current (blue trace) and lifetime (red one) around the clock.


November 17

Beam profile which was monitored at the beamline BL-21 (5:27 PM). Beam current: 58.3 mA. Horizontal beam size was about one third than that under the routine (medium-emittance) optics, as was expected.

Improved beam filling rate. The filling rate was improved from 0.02 to 0.16 mA/sec.

Beam current (blue trace) around the clock.
Study on the low-emittance optics was carried out from 9:00 AM to 1:16 AM (Nov. 18).
We achieved the maximum beam current of about 150 mA under the new optics.


November 18

Beam current (blue trace) and lifetime (red one) around the clock.


November 19

Beam current (blue trace) and lifetime around the clock.


November 20

Beam current (blue trace) and lifetime (red) around the clock.


November 21

Beam current (blue trace) and lifetime (red) around the clock.