November 22-30, 1997

November 22 , 23 , 24 , 25 , 26 , 27 , 28 , 29 , 30


November 22

Beam current (blue trace) and lifetime (red) around the clock.


November 23

Beam current (blue trace) and lifetime (red) around the clock.


November 24

Beam profile under the new optics (105 degrees/cell). Beam current: 397 mA. Observed at the beamline BL-21.

Beam profile under the usual optics.

Result of the tune survey. We changed the phase advance from 90 to 105 degrees per cell.

Beam current (blue trace) and lifetime (red) during this study.
The maximum beam current of 400 mA was stored at 6:19 PM (under 90 deg. optics) and 3:04 AM, Nov. 25 (under 105 deg. optics).


November 25

Beam current (blue line) and lifetime (red).


November 26

Beam current (blue trace) and lifetime (red).


November 27

Beam current (blue trace) and lifetime (red).


November 28

Beam current (blue) and lifetime (red) today.


November 29

Beam current (blue trace) and lifetime (red) today.


November 30

Beam current (blue trace) and lifetime (red) today.