October 19, 1997

Vacuum conditioning (outgassing by SR) was carried out with beam currents of 450-500 mA.

A new control system for the multipole wiggler #13 was also tested.

Beam dumps happened at 1:35 PM (while tuning the orbit) and 3:32 PM (due to klystron HV down), but it recovered quickly.

An integrated current of 10.7 A*hrs was gained from 9:07 AM (Oct. 18) and 9:08 AM (Oct. 19). Average beam current was 445 mA during this 24-hours.


Beam current in the evening.
Vacuum conditioning is under way.