October 22, 1997
Beam current (blue line) and beam lifetime (red line) from 9:00 AM, Oct. 22 to 9:00 AM, Oct. 23. Conditioning of the beamline vacuum was carried out
Status of the PF ring at 10:02 AM. Most of the beam shutters are open.
Vacuum pressures of the beam-line front ends at 10:02 AM. Beam current is 20 mA.