- Correction of the beam orbit concerned with insertion
devices was carried out in the morning.
- An orbit feedback system was tested from the afternoon
to the midnight.
- Vacuum conditioning was carried out in the midnight while
using the orbit feedback system.
- An integrated stored current of 5.4 A*hrs was gained
during 9:00 AM (Oct. 22) and 9:02 AM (Oct. 23). Average beam current was
226 mA during this period.
Beam current (blue line) and beam lifetime
(red line) from 9:00 AM, Oct. 23 to 9:00 AM, Oct. 24.
Tuning on the beam orbit and test of the orbit-feedback system were carried
out until midnight. Vacuum conditioning was carried out in the midnight.