October 23, 1997


Beam current (blue line) and beam lifetime (red line) from 9:00 AM, Oct. 23 to 9:00 AM, Oct. 24.
Tuning on the beam orbit and test of the orbit-feedback system were carried out until midnight. Vacuum conditioning was carried out in the midnight.