October 26, 1997
- Test on the orbit feedback system was carried out from
9:22 AM to 0:02 AM, Oct. 27. Vacuum conditioning resumed after that.
- An integrated stored current of 7.9 A*hrs was gained
during 7:36 AM (Oct. 25) and 9:00 AM (Oct. 26). Average beam current was
311 mA during this period.
Beam current (blue) and beam lifetime (red)
around the clock.