October 27, 1997
- Test on the orbit feedback system was carried out from
9:50 AM to 0:58 AM (Oct. 28).
- We had a beam dump at 3:38 PM due to trouble with an
isolation valve in a beamline BL-12, but the problem was quickly fixed.
- An integrated stored current of 9.2 A*hrs was gained
during 9:00 AM (Oct. 26) and 9:01 AM (Oct. 27). Average beam current was
384 mA during this period.
Beam current (blue line) and beam lifetime
(red line) around the clock.