October 28, 1997
- Measurement on the beam emittance was carried out (1:00
to 7:24 AM).
- Correction data for the insertion devices (MPW#13 and
MPW#16) were taken (9:00 AM - 6:14 PM)
- The orbit feedback system was tested (7:34 PM - 2:26
AM, Oct. 29). Vacuum conditioning was carried out after that.
- Operational data in this morning:
Time |
Beam current |
Beam lifetime |
I*tau |
Average pressure |
Integrated current |
9:17 AM |
394.9 mA |
432 minutes |
171 A*minutes |
0.49 nTorr |
166.5 A*hours |
Beam current (blue line) and beam lifetime
(red line) around the clock.