October 3, 1997
A problem in the RF phase shifter, which had (probably) caused the difficulty in re-storing beams, was found and fixed. The beam was successfully re-stored in the ring at around 1:00 AM.
Vacuum conditioning (outgassing by beams) was performed.
Injection efficiency was largely improved. Filling rate of 0.3 mA/sec was obtained.
Maximum stored current of 80 mA was achieved at 11:38 PM.
The beam current around 2:00 PM. Vacuum conditioning is under way.
Beam filling rate (arond 6:00 PM) was improved.