October 6, 1997

Vacuum conditioning and tuning of RF system were carried out in the morning.

Achieved the maximum stored current of 332.7 mA at 9:23 AM.

A beam position monitor (BPM) electrode was investigated in the afternoon.

Tune survey was carried out during 7:00 PM - 1:00 AM (Oct. 7).


Stored beam current in the morning.


Tune survey.
Current operating point is (8.45, 3,31) for the horizontal and the vertical betatron tunes.