October 7, 1997

Maximum beam current of 361.3 mA was achieved at 7:08 AM during the vacuum conditioning.

Linac study & maintenance took place from 9:00 AM to 0:00 AM (midnight).

Stored beam was lost at 11:36 AM due to an RF trip. No beam was stored until 0:20 AM (Oct. 8).


Stored beam current in the morning.