Operation schedule Apr.- Jul., 2000

  SUN MON TUE WED THU FRI SAT
Date 3/26 3/27 3/28 3/29 3/30 3/31 4/1
PF stop
PF-AR stop
Date 4/2 4/3 4/4 4/5 4/6 4/7 4/8
PF stop T/M BA E
PF-AR stop  
Date 4/9 4/10 4/11 4/12 4/13 4/14 4/15
PF E M B E
PF-AR  
Date 4/16 4/17 4/18 4/19 4/20 4/21 4/22
PF E M B E
PF-AR  
Date 4/23 4/24 4/25 4/26 4/27 4/28 4/29
PF E B E stop
PF-AR   stop
Date 4/30 5/1 5/2 5/3 5/4 5/5 5/6
PF stop
PF-AR stop
Date 5/7 5/8 5/9 5/10 5/11 5/12 5/13
PF stop T/M 3G MB
PF-AR stop  
Date 5/14 5/15 5/16 5/17 5/18 5/19 5/20
PF 3GeV MB M B E
PF-AR  
Date 5/21 5/22 5/23 5/24 5/25 5/26 5/27
PF E M B E
PF-AR  
Date 5/28 5/29 5/30 5/31 6/1 6/2 6/3
PF E M B E
PF-AR  
Date 6/4 6/5 6/6 6/7 6/8 6/9 6/10
PF E MA/M B E
PF-AR  
Date 6/11 6/12 6/13 6/14 6/15 6/16 6/17
PF E M B E
PF-AR  
Date 6/18 6/19 6/20 6/21 6/22 6/23 6/24
PF E M B E
PF-AR  
Date 6/25 6/26 6/27 6/28 6/29 6/30 7/1
PF E M B(SB) SB
PF-AR  
Date 7/2 7/3 7/4 7/5 7/6 7/7 7/8
PF SB MA/M B E
PF-AR  
Date 7/9 7/10 7/11 7/12 7/13 7/14 7/15
PF E M B E
PF-AR  
Date 7/16 7/17 7/18 7/19 7/20 7/21 7/22
PF E M B E
PF-AR  
Date 7/23 7/24 7/25 7/26 7/27 7/28 7/29
PF E M stop
PF-AR   stop
The schedule is subject to change.
Please note the latest information.
[PF ring]
T/M tuning and ring machine study
M ring machine study
MA/M short maintenance and/or machine study
B bonus time. Linac study has the priority after injection to PF in the morning.
E experiment using SR (36 nmrad)
BA beam alignment (ca. 30 min. from 9:00)
SB Single Bunch Operation at 2.5 GeV (max. current will be ca. 70mA)
3GeV MB multi-bunch operation at 3 GeV (max. current will be ca. 200mA)
SS summer school
[PF-AR]
  commissioning and/or experiment using SR

更新日 99/12/18
名前 野村昌治
電子メール アドレス : masaharu.nomura@kek.jp