Operation schedule Oct.- Dec., 2000

  SUN MON TUE WED THU FRI SAT
Date 9/24 9/25 9/26 9/27 9/28 9/29 9/30
PF stop
PF-AR stop
Date 10/1 10/2 10/3 10/4 10/5 10/6 10/7
PF stop T/M BA E
PF-AR stop  
Date 10/8 10/9 10/10 10/11 10/12 10/13 10/14
PF E B E
PF-AR  
Date 10/15 10/16 10/17 10/18 10/19 10/20 10/21
PF E M B E
PF-AR  
Date 10/22 10/23 10/24 10/25 10/26 10/27 10/28
PF E MA/M B E
PF-AR  
Date 10/29 10/30 10/31 11/1 11/2 11/3 11/4
PF E M B(SB) SB
PF-AR  
Date 11/5 11/6 11/7 11/8 11/9 11/10 11/11
PF SB M B E
PF-AR  
Date 11/12 11/13 11/14 11/15 11/16 11/17 11/18
PF E M B E
PF-AR  
Date 11/19 11/20 11/21 11/22 11/23 11/24 11/25
PF E M B E
PF-AR  
Date 11/26 11/27 11/28 11/29 11/30 12/1 12/2
PF E MA/M B E
PF-AR  
Date 12/3 12/4 12/5 12/6 12/7 12/8 12/9
PF E M B E
PF-AR  
Date 12/10 12/11 12/12 12/13 12/14 12/15 12/16
PF E M B(3G MB) 3G MB
PF-AR  
Date 12/17 12/18 12/19 12/20 12/21 12/22 12/23
PF 3GeV MB B(3G MB) 3G MB stop
PF-AR   stop
Date 12/24 12/25 12/26 12/27 12/28 12/29 12/30
PF stop
PF-AR stop
Date 12/31 1/1 1/2 1/3 1/4 1/5 1/6
PF stop
PF-AR stop
May 17,2000
The schedule is subject to change.
Please note the latest information.
[PF ring]
T/M tuning and ring machine study
M ring machine study
MA/M short maintenance and/or machine study
B bonus time. Linac study has the priority after injection to PF in the morning.
E experiment using SR (36 nmrad)
BA beam alignment (ca. 30 min. from 9:00)
SB Single Bunch Operation at 2.5 GeV (max. current will be ca. 70mA)
3GeV MB multi-bunch operation at 3 GeV (max. current will be ca. 200mA)
[PF-AR]
  commissioning and/or experiment using SR
   

更新日 00/05/17
名前 野村昌治
電子メール アドレス : masaharu.nomura@kek.jp