Operation schedule Jan. - Mar., 2001

  SUN MON TUE WED THU FRI SAT
Date 1/7 1/8 1/9 1/10 1/11 1/12 1/13
PF stop
PF-AR stop
Date 1/14 1/15 1/16 1/17 1/18 1/19 1/20
PF stop T/M BA E
PF-AR stop  
Date 1/21 1/22 1/23 1/24 1/25 1/26 1/27
PF E M B E
PF-AR  
Date 1/28 1/29 1/30 1/31 2/1 2/2 2/3
PF E M B E
PF-AR  
Date 2/4 2/5 2/6 2/7 2/8 2/9 2/10
PF E M B(SB) SB
PF-AR  
Date 2/11 2/12 2/13 2/14 2/15 2/16 2/17
PF SB M B E
PF-AR  
Date 2/18 2/19 2/20 2/21 2/22 2/23 2/24
PF E MA/M B E
PF-AR  
Date 2/25 2/26 2/27 2/28 3/1 3/2 3/3
PF E M B E
PF-AR   stop
Date 3/4 3/5 3/6 3/7 3/8 3/9 3/10
PF E M 3G MB stop
PF-AR stop
Date 3/10 3/11 3/12 3/13 3/14 3/15 3/16
PF stop
PF-AR stop
Date 3/17 3/18 3/19 3/20 3/21 3/22 3/23
PF stop
PF-AR stop
Date 3/24 3/25 3/26 3/27 3/28 3/29 3/30
PF stop
PF-AR stop
Jan. 16, 2001
The schedule is subject to change.
Please note the latest information.
[PF ring]
T/M tuning and ring machine study
M ring machine study
MA/M short maintenance and/or machine study
B bonus time. Linac study has the priority after injection to PF in the morning.
E experiment using SR (36 nmrad)
BA beam alignment (ca. 30 min. from 9:00)
SB Single Bunch Operation at 2.5 GeV (max. current will be ca. 70mA)
3GeV MB multi-bunch operation at 3 GeV (max. current will be ca. 200mA)
[PF-AR]
  commissioning and/or experiment using SR
Upgrade program of PF-AR is to be carried out between March and December, 2001.