Operation schedule Apr. - Jul.., 2001

  SUN MON TUE WED THU FRI SAT
Date 3/25 3/26 3/27 3/28 3/29 3/30 3/31
PF stop
PF-AR stop
Date 4/1 4/2 4/3 4/4 4/5 4/6 4/7
PF stop T/M BA E
PF-AR stop
Date 4/8 4/9 4/10 4/11 4/12 4/13 4/14
PF E M B E
PF-AR stop
Date 4/15 4/16 4/17 4/18 4/19 4/20 4/21
PF E M B(3GMB) 3G MB
PF-AR stop
Date 4/22 4/23 4/24 4/25 4/26 4/27 4/28
PF 3G MB M B(3GMB) 3G MB stop
PF-AR stop
Date 4/29 4/30 5/1 5/2 5/3 5/4 5/5
PF stop
PF-AR stop
Date 5/6 5/7 5/8 5/9 5/10 5/11 5/12
PF stop T/M E
PF-AR stop
Date 5/13 5/14 5/15 5/16 5/17 5/18 5/19
PF E M B E
PF-AR stop
Date 5/20 5/21 5/22 5/23 5/24 5/25 5/26
PF E M B E
PF-AR stop
Date 5/27 5/28 5/29 5/30 5/31 6/1 6/2
PF E M B E
PF-AR stop
Date 6/3 6/4 6/5 6/6 6/7 6/8 6/9
PF E MA/M B E
PF-AR stop
Date 6/10 6/11 6/12 6/13 6/14 6/15 6/16
PF E M B(SB) SB
PF-AR stop
Date 6/17 6/18 6/19 6/20 6/21 6/22 6/23
PF SB M B E
PF-AR stop
Date 6/24 6/25 6/26 6/27 6/28 6/29 6/30
PF E M B E
PF-AR stop
Date 7/1 7/2 7/3 7/4 7/5 7/6 7/7
PF E M B E stop
PF-AR stop
16-Jan-01
The schedule is subject to change.
Please note the latest information.
[PF ring]
T/M tuning and ring machine study
M ring machine study
MA/M short maintenance and/or machine study
B bonus time. Linac study has the priority after injection to PF in the morning.
E experiment using SR (36 nmrad)
BA beam alignment (ca. 30 min. from 9:00)
SB Single Bunch Operation at 2.5 GeV (max. current will be ca. 70mA)
3GeV MB multi-bunch operation at 3 GeV (max. current will be ca. 200mA)
SS summer school
[PF-AR]
  commissioning and/or experiment using SR
Upgrade program of PF-AR is to be carried out between March and December, 2001.