Operation schedule Apr.2002-Jul.2002

  SUN MON TUE WED THU FRI SAT
Date 3/24 3/25 3/26 3/27 3/28 3/29 3/30
PF stop
PF-AR stop
Date 3/31 4/1 4/2 4/3 4/4 4/5 4/6
PF stop T/M BA E
PF-AR stop
Date 4/7 4/8 4/9 4/10 4/11 4/12 4/13
PF E M B E
PF-AR stop T/M
Date 4/14 4/15 4/16 4/17 4/18 4/19 4/20
PF E M B(3GMB) 3G MB
PF-AR T/M B E
Date 4/21 4/22 4/23 4/24 4/25 4/26 4/27
PF 3G MB M B(3GMB) 3G MB stop
PF-AR E M B E stop
Date 4/28 4/29 4/30 5/1 5/2 5/3 5/4
PF stop
PF-AR stop
Date 5/5 5/6 5/7 5/8 5/9 5/10 5/11
PF stop T/M E
PF-AR stop T/M/E
Date 5/12 5/13 5/14 5/15 5/16 5/17 5/18
PF E M B E
PF-AR T/M/E B E
Date 5/19 5/20 5/21 5/22 5/23 5/24 5/25
PF E M B E
PF-AR E M B E
                                           
Date 5/26 5/27 5/28 5/29 5/30 5/31 6/1
PF E M B E
PF-AR E M B E
Date 6/2 6/3 6/4 6/5 6/6 6/7 6/8
PF E MA/E B E
PF-AR E M B E
Date 6/9 6/10 6/11 6/12 6/13 6/14 6/15
PF E M B(SB) SB
PF-AR E M B E
Date 6/16 6/17 6/18 6/19 6/20 6/21 6/22
PF SB M B E
PF-AR E M B E
Date 6/23 6/24 6/25 6/26 6/27 6/28 6/29
PF E M/E B E
PF-AR E M B E stop
Date 6/30 7/1 7/2 7/3 7/4 7/5 7/6
PF E stop
PF-AR stop
Date 7/7 7/8 7/9 7/10 7/11 7/12 7/13
PF stop
PF-AR stop
Date 7/14 7/15 7/16 7/17 7/18 7/19 7/20
PF stop
PF-AR stop
Date 7/21 7/22 7/23 7/24 7/25 7/26 7/27
PF stop
PF-AR stop
15-May-02
The schedule is subject to change.
Please note the latest information.
Jun. 3 & Jun. 24 are specially scheduled. See the text ("operation schedule").
[PF ring & PF-AR ring]
T/M tuning and ring machine study
T/M/E commissioning and/or experiment using SR [PF-AR ring]
M ring machine study
MA/M short maintenance and/or machine study
B bonus time. Linac study has the priority after injection to PF & PF-AR.
E experiment using SR
BA beam alignment (ca. 30 min. from 9:00) [PF ring]
SB Single Bunch Operation at 2.5 GeV (max. current will be ca. 70mA) [PF ring]
3GeV MB multi-bunch operation at 3 GeV (max. current will be ca. 200mA) [PF ring]

更新日 02/05/15
名前 岸本俊二
電子メール アドレス : syunji.kishimoto@kek.jp