| Submission of the Research Proposal |
Last modified
2012-01-24
|
||
| User's Guide HOME | |||
Application due
dates and submission system
The Photon Factory (PF) sets due date twice a year for proposals
to use the public beamlines. Please refer to this User's Guide if you plan to
apply.
NOTE) Overseas applicants are required to assign a contact
person to act as an intermediary with the Photon Factory before applying.
See detail.
|
The deadline for application which starts from September 2012
|
|
| Category S2, G, P type |
May 4th (Fri.) 2012, 17:00 JST [CLOSED]
|
Proposal submission system has been newly launched. Please apply using this on-line submission system.
If you have any questions about our new system, please send your email to;
Katsumi Kobayashi
Professor
Research Service Office
E-mail: katsumi.kobayashi@kek.jp
Guidelines for filling the application form
Basic Information
A proposal is mainly evaluated based on its scientific merit and technical feasibility of the research plan. You should clearly express what you plan to carry out during the valid term of the proposal. Proposals which do not have strong scientific relation should be submitted separately. An example is protein A and protein B that have little biological relations.
[Proposal categories]
Research proposals are categorized into five (P, G, S1, S2, U). Please
choose the one which is most appropriate for your experiment among them. For
the details of the each category, please refer to the following list.
|
Category
|
Proposal Character | |
|---|---|---|
|
Special 1 (S1)
|
Research project which requires the beamline remodeling/construction and also large equipment preparation. | DETAILS |
|
Special 2 (S2)
|
High level research project which requires full use of synchrotron radiation and long beamtime. | DETAILS |
|
General (G)
|
General synchrotron radiation experiment. | DETAILS |
|
Preliminary &
Beginner Experiment (P) |
Preliminary experiment to be made before applying for "G" or
"S" type experiment, or the experiment for a non-experienced synchrotron
radiation user. Discussion with the spokesperson of the beamline is required before the submission of the proposal. |
DETAILS |
|
Urgent & Important (U)
|
Exceedingly important proposal which can not wait until next PF-PAC and the experiment which has a higher priority than the proposal that already approved. | DETAILS |
[Proposal title]
A simple and concrete title is required in 150characters max (not comprehensive). Imagine the title that may be used in a paper for the result.
[Research field]
Please indicate the research field of your proposal referring
to the "Research Field" below. The multiple numbers can be applied.
|
Field No.
|
Research Field
|
Research Subject, Example
|
|
1 |
Spectroscopy on electronic structure |
Research on the electronic state of material.
Key words: Spectroscopy of atoms and molecules, high resolution spectroscopy of photo/Auger electrons, band structure, multiple ionization, photodesorption. |
|
2
|
Structure analysis by diffraction and scattering |
Research on the material structure by the method of diffraction,
scattering Key words: Accurate structure analysis, lattice distortion, structure of surface/interface, diffraction under extreme conditions, charge order, X-ray topography, Mossbauer Spectroscopy. |
|
3
|
Chemistry & new materials |
Research on the chemical condition, and creation
and characterization of new materials. Research on soft matters by the method
of SAXS is reviewed by Life Science II Subcommittee. Key words: Chemical bonding, Catalyst, Local atomic structure, alloys of metals or polymers, high Tc materials, structure analysis of non-crystalline materials. |
|
4
|
Life science I | Protein crystallography |
|
5
|
Life science II | Life sciences other than protein crystallography, and research on soft matters by the method of SAXS. |
|
6
|
Methods and instrumentation, detectors |
Overseas applicants are required to assign a contact person to act as an intermediary with the Photon Factory. His/her approval to act as CPJ is obligatory. This contact person should live in Japan and be a Japanese speaker. The contact person will ensure that the application procedure runs smoothly, and will also assist with visa procedures, reservation of accommodations etc. If you do not know any appropriate person for the Contact Person, the person in charge of the station you want to use can help you find candidates for CPJ.
Detailed information
[Significance, aim, originality and expected outcome of this work (including why you need Photon Factory]
Take care to make it understandable to other fields' people.
[[Proposed experimental method and layout (schemes can be included). The reason why you choose the station or required beam specification (photon energy, flux, beam size, etc). Justify the requested amount of beam time.]
[List of samples (Obligatory). Remarks and safety measures against possible hazards (chemicals, biological materials, radiation, high voltage, high pressure, contamination of vacuum, etc.).]
[Accomplishment and/or publications in your previous research programs in related fields. Status of sample/equipment preparation.]
Mainly the status and the experience of the application group (not the status of overseas)
Remarks
Proposals are reviewed by referees, then in Photon Factory Program Advisory Committee (PF-PAC). Proposals are scored between 5 and 0 (5 is the highest). Those above threshold are approved by PF-PAC. A proposal is evaluated based on its scientific merit, technical feasibility of the research plan and capability of the experimental group. The approval of a proposal means that it is evaluated to be worth doing by PF-PAC. However, please mind that the "approval" does not always guarantee the allocation of beam time you wrote in the application form. For your reference, show you the graph of the distribution of the approved proposal scores in FY 2011.
PF-PAC pays more attention to the productivity of the proposing user groups when reviewing the proposals.
In case a spokesperson has more than two approved proposals between 8.5 years and 2.5 years ago from when the applied proposal becomes active,
PF-PAC held on June 25 decided to apply this rule from the next applications.
![]()